Completed this bathroom remodel in early 2018. Removed a tub and enclosure and installed a new shower stall, new vanity and toilet.
Photo Albums for Gilmore Construction & Development, Inc.
Chico Kitchen Remodel
Removed (E) cabinets, countertops, and wiring. Installed 2 new circuits for ref. & microwave. Removed (E) lights and installed new recessed lighting. Installed new drywall, cabinets, granite countertops along with new sink, faucet & stainless steel appliances.
Paradise Bath 2015
We completely gutted the bathroom, taking out fiberglass tub shower unit, existing wood wainscoating and walls. We installed a new tiled tub/shower unit with new diagonal tile floors & tile wainscoat on the walls. We installed a new fan light combo. w/night light and a new recessed light over shower area. We installed a mission style vanity with a granite counter top and granite window sill. We installed drywall and textured to match existing finish. N Toilet with dual flush controls.